SIMPEC Projects

FQM RNO SHOEMAKER LEVY

First Quantum Minerals
Raventhorpe, WA

RNO is in the Esperance region of Western Australia, approximately 550km south-east of the State capital Perth. RNO commenced a restart process in readiness for early 2020. Investment is undertaken at RNO to expand into a second stage nickel laterite deposit, known as Shoemaker-Levy.

view case studycareersElectrical & Instrumentation

Pilbara Minerals Stage 1 Improvement Works

Pilbara Minerals
Pilgangoora, WA

Pilgangoora Lithium-Tantalum Project (Pilgangoora Project), with a current resource of 226Mt. The resource is geographically situated approximately 120km South South-East of the major port of Port Hedland in Western Australia’s Pilbara Region.

view case studycareersElectrical & Instrumentation

Acciona KWtE BOP Piping Package

Acciona
Kwinana, WA

The Waste-to-Energy project is located in Kwinana, Western Australia. Waste to Energy is an alternative, renewable energy which will deliver an enhanced and sustainable quality of life for all.

view case studycareersStructural Mechanical & Piping

MSP | TIANQI LITHIUM - PYROMET PIPING PROJECT

MSP Engineering Pty Ltd
Kwinana | Western Australia

Tianqi Lithium has appointed MSP Engineering Pty Ltd (MSP) as Head Contractor to design and construct the TLK LHHP1 Project. SIMPEC's scope of work is for installation and pressure testing of piping in the Pyromet Area on Stage 1.

view case studycareersStructural Mechanical & Piping

MSP | TALISON LITHIUM - CHEMICAL GRADE PLANT 2 TANKS

MSP Engineering Pty Ltd
Greenbushes | Western australia

The CGP2 project will significantly expand production of Lithium Oxide concentrates from the Talison Lithium Mine in Greenbushes, WA. SIMPEC were engaged by MSP Engineering to design and construct four Strake Tanks - a critical asset within the project.

view case studycareersStructural Mechanical & Piping

Kwinana Grain Terminal Cathodic Protection Project

CBH Group
Kwinana, WA

CBH Group is taking steps to ensure the longevity of the one of its 4 Wharfs, The Kwinana Grain Terminal (KGT). KGT is considered one of CBHs most valuable assets, being a major exporting port for many of WAs farmers.

view case studycareersElectrical & Instrumentation

ATCO | FMG – ELIWANA VILLAGE

ATCO | Fortescue Metals Group
115km West-southwest of FMG’s Solomon Operation | Western Australia

SIMPEC Pty Ltd has been engaged to supply and install the Electrical, Communications and Fire services for the state of the art, architecturally designed Village to house the construction and permanent operational workers for the Eliwana mine and rail facility.

view case studycareersElectrical & Instrumentation

TIANQI LITHIUM - LITHIUM HYDROXIDE PROCESSING PLANT STAGE 1 (LHPP1)

TIANQI LITHIUM
Kwinana | Western Australia

SIMPEC’s scope of work for this contract includes installation of electrical and instrumentation (E&I) works as well as mechanical and piping completions to enable handover of LHPP1 to the Client’s commissioning team.

view case studycareersAsset Managagement Services

KWtE SMP Construction Work

Acciona Construction Australia
Kwinana, WA

The Kwinana Waste to Energy project will develop a waste processing facility which will use moving grate technology to process approximately 400,000 tonnes of municipal solid waste, commercial and industrial waste and/or pre-sorted construction and demolition waste per annum.

view case studycareersStructural Mechanical & Piping

M5 West Connex

CPB / Dragados / Samsung CT
Sydney, NSW

The New M5 will provide twin underground motorway tunnels, nine kilometres long, from Kingsgrove to a new St Peters Interchange at the site of the old Alexandria landfill facility.

view case studycareersElectrical & Instrumentation

EPSA | FMG ELIWANA - DIESEL POWER GENERATION

Energy Power Systems Australia
Eliwana Project | Western Australia

SIMPEC has been engaged by Energy Power Systems Australia to supply and install a full Vertical Power Generation Package comprising of Civil, Mechanical, Piping, Electrical and Instrumentation work.

view case studycareersStructural Mechanical & Piping

RIO TINTO LIMITED – RDSS PROJECT

Rio Tinto
Cape Lambert Port Facility | Western Australia

Supply and install a Remote Draft Survey System utilising cutting edge technology to remotely assess vessel capacity under ship loading conditions. This method of assessment will increase turnaround time for ship-loading activities, resulting in improved safety, and reduced costs to the operator.

view case studycareersElectrical & Instrumentation

ATCO | RIO TINTO LIMITED - WEST ANGELAS MINE CAMP

ATCO / Rio Tinto
West Angelas | Western Australia

ATCO Structures and Logistics have been engaged to complete construction of temporary accommodation facilities for use by RioTinto and their subcontractors catering for ~600 employees. SIMPEC will fulfill a key Mechanical, Electrical and Communications contract in constructing the camp facilities.

view case studycareersNon-Process Infrastructure

ILUKA RESOURCES - FLOCCULANT PLANT INSTALLATION

Iluka Resources
Cataby | Western Australia

SIMPEC will fabricate and install the Flocculant Plant for Iluka Resources Limited's new mine at Cataby. The mine will produce approximately 5.4 million tonnes of Heavy Mineral Concentrate (HMC) over an expected mine life of 9 years.

view case studycareersStructural Mechanical & Piping

RTIO Emergency Escape Stairway

RTIO
Yandicoogina, WA

RTIO completed a fire impact risk assessment resulting in improvement of the existing fire protection systems and Yandicoogina.

view case studycareersAsset Managagement Services

FMG Cloudbreak Jaw Crusher Replacement

Fortescue Metals Group Ltd
Cloudbreak, WA

The Hopper 5 building is the primary crushing facility at Cloudbreak that feeds the plant with sub 200mm material. The two C160 Metso jaw crushers in this building were installed second-hand during construction of the Cloudbreak mine and were nearing their end of life.

view case studycareersAsset Managagement Services

CBH Brookton Throughput Enhancement

CBH Group
Brookton, WA

The Brookton grain handling facility is a key storage and distribution centre for grain produced in the wheatbelt of WA. The expansion was to increase the conveyors handling to 500t per hour and to reduce dust generation.

view case studycareersAsset Managagement Services

GROUNDED CONSTRUCTION | ILUKA RESOURCES - CATABY PROJECT

Grounded Construction | Iluka Resources
Dandaragan, Western Australia

The Cataby Project was approved by Iluka Resources in Dec 2017 to develop the Cataby mineral sands deposit in Western Australia. Grounded Construction was engaged to provide construction services, enlisting SIMPEC for the Electrical and Communications works for the Accommodation Facilities.

view case studycareersElectrical & Instrumentation

KWtE SMP Construction Work

Acciona Construction Australia
Kwinana, WA

view case studycareersStructural Mechanical & Piping

Acciona KWtE BOP Piping Package

Acciona
Kwinana, WA

view case studycareersStructural Mechanical & Piping

EPSA | FMG ELIWANA - DIESEL POWER GENERATION

Energy Power Systems Australia
Eliwana Project | Western Australia

Energy Power Systems support major construction projects in the government and private sectors across Australia. Offering standardised and custom engineered solutions to achieve lowest cost of ownership without sacrificing performance, availability and maintainability throughout the whole of a project life. EPSA provide solutions for Infrastructure, Resources & Mining, Oil & Gas, Defence, Industrial, Marine, Agricultural, Data Centres and Power Generation markets.

view case studycareersStructural Mechanical & Piping

MSP | TIANQI LITHIUM - PYROMET PIPING PROJECT

MSP Engineering Pty Ltd
Kwinana | Western Australia

Tianqi Lithium has appointed MSP Engineering Pty Ltd (MSP) as Head Contractor to design and construct the TLK LHHP1 Project. MSP is a leading engineering and project delivery company, which specialises in the development of mineral processing facilities and associated infrastructure around the world.

view case studycareersStructural Mechanical & Piping

ILUKA RESOURCES - FLOCCULANT PLANT INSTALLATION

Iluka Resources
Cataby | Western Australia

Iluka Resources Limited was formed in 1998 with the company operations in the South west of Western Australia stretching up to the mid west.

view case studycareersStructural Mechanical & Piping

MSP | TALISON LITHIUM - CHEMICAL GRADE PLANT 2 TANKS

MSP Engineering Pty Ltd
Greenbushes | Western australia

Talison has appointed MSP Engineering Pt Ltd (MSP) as Head Contractor to design and construct the CGP2 Project. MSP is a leading engineering and project delivery company, which specialises in the development of mineral processing facilities and associated infrastructure around the world.

view case studycareersStructural Mechanical & Piping

Kwinana Grain Terminal Cathodic Protection Project

CBH Group
Kwinana, WA

view case studycareersElectrical & Instrumentation

M5 West Connex

CPB / Dragados / Samsung CT
Sydney, NSW

view case studycareersElectrical & Instrumentation

Pilbara Minerals Stage 1 Improvement Works

Pilbara Minerals
Pilgangoora, WA

view case studycareersElectrical & Instrumentation

FQM RNO SHOEMAKER LEVY

First Quantum Minerals
Raventhorpe, WA

view case studycareersElectrical & Instrumentation

GROUNDED CONSTRUCTION | ILUKA RESOURCES - CATABY PROJECT

Grounded Construction | Iluka Resources
Dandaragan, Western Australia

Grounded Construction Pty Ltd is a Western Australian company that provides Construction and Maintenance services for mining and civil projects. Its main area of focus is supply and installation of modular buildings for mining projects and accommodation facilities.

view case studycareersElectrical & Instrumentation

ATCO | FMG – ELIWANA VILLAGE

ATCO | Fortescue Metals Group
115km West-southwest of FMG’s Solomon Operation | Western Australia

ATCO Structures & Logistics Pty Ltd. has been providing quality modular building solutions throughout Australia since 1961. Headquartered in Brisbane, Queensland, ATCO Structures & Logistics has nine sales offices; as well as manufacturing facilities in Brisbane in Queensland; Melbourne, Victoria; and in Perth, Western Australia. ATCO S&L have been involved with many major projects in Australia that cemented their position as the leading modular construction provider.

view case studycareersElectrical & Instrumentation

RIO TINTO LIMITED – RDSS PROJECT

Rio Tinto
Cape Lambert Port Facility | Western Australia

After almost 150 years of pioneering exploration, expansion, diversification and innovation, Rio Tinto stands today as one of the world’s largest producers of a range of essential materials, and a major force driving human progress. Rio Tinto is headquartered in London and has a corporate office in Melbourne.

view case studycareersElectrical & Instrumentation

CBH Brookton Throughput Enhancement

CBH Group
Brookton, WA

view case studycareersAsset Managagement Services

FMG Cloudbreak Jaw Crusher Replacement

Fortescue Metals Group Ltd
Cloudbreak, WA

view case studycareersAsset Managagement Services

RTIO Emergency Escape Stairway

RTIO
Yandicoogina, WA

view case studycareersAsset Managagement Services

TIANQI LITHIUM - LITHIUM HYDROXIDE PROCESSING PLANT STAGE 1 (LHPP1)

TIANQI LITHIUM
Kwinana | Western Australia

Listed on the Shenzhen Stock Exchange, Tianqi Lithium is a global new energy materials company, with lithium at its core. With over 20 years’ experience in the production of lithium product, Tianqi Lithium has world leading positions in its major businesses of lithium resource investment, lithium concentrate extraction and the production of advanced lithium specialty compounds. With resource and production assets located in the pre-eminent lithium regions of Australia, Chile and China, its fully vertical-integrated businesses ensures the Company is optimally positioned to partner with international customers to support the long-term sustainable development of lithium-ion battery technologies for application in the electric vehicle and energy storage industries.

view case studycareersAsset Managagement Services

ATCO | RIO TINTO LIMITED - WEST ANGELAS MINE CAMP

ATCO / Rio Tinto
West Angelas | Western Australia

ATCO Structures & Logistics Pty Ltd. has been providing quality modular building solutions throughout Australia since 1961. Headquartered in Brisbane, Queensland, ATCO Structures & Logistics has nine sales offices; as well as manufacturing facilities in Brisbane in Queensland; Melbourne, Victoria; and in Perth, Western Australia.

view case studycareersNon-Process Infrastructure