Project Overview

date completed

The Western Harbour Tunnel is a major transport infrastructure project being delivered in Sydney, providing a new road crossing beneath Sydney Harbour and improving connectivity between Sydney's northern and western transport corridors. SIMPEC has been engaged to deliver the Mechanical package, providing specialist mechanical installation services to support completion of critical tunnel infrastructure systems. The works form part of the tunnel's operational readiness and commissioning program, ensuring key mechanical systems are installed, tested and prepared for safe operation.

Client Overview

ACCIONA is a global leader in sustainable infrastructure and renewable energy development, delivering major engineering, construction and infrastructure projects across transport, energy, water and social infrastructure sectors worldwide. The company has a strong presence in Australia, with a proven track record of successfully delivering complex and iconic projects including the Sydney Opera House renewal works, Anzac Bridge, and the WestConnex M4-M5 Link Tunnels. For the Western Harbour Tunnel Stage 2 project, ACCIONA is leading delivery of one of Australia's largest transport infrastructure contracts, valued at approximately $4.24 billion, reinforcing its position as a trusted partner in the delivery of complex, large-scale infrastructure projects that create long-term community and economic benefits.

Scope of Work

SIMPEC's scope includes the provision of project management,supervision, skilled labour, fabrication, plant and equipment required toexecute the RW-1704 Mechanical works within the tunnel ventilation facilitiesand associated infrastructure.

Installation of Client-Supplied Mechanical Equipment

-           10 × Axial Ventilation Fans (10.5 tonnes each)

-           17 × Isolation Dampers

-           10 × ATMOS Attenuators

-           10 × Tunnel-Side Attenuators

-           2 × Acoustic Doors

Fabrication & Steelwork Installation

-           Installation of fabricated steelwork and supportstructures

-           Fabrication and installation of 10 × TransitionDucts, including support frames

-           Fabrication and installation of 10 × Axial FanSupport Frames

-           Fabrication and installation of 26 × ManualSampling Ports

-           Installation of associated mechanical supportsand ancillary components

Project Delivery Services

-           Project management, supervision and sitecoordination

-           Equipment setting out, alignment andinstallation

-           Quality assurance, inspection and testdocumentation

-           Interface coordination with client,subcontractors and stakeholders

-           Defect rectification and commissioning support

-           Handover documentation and close-out activities

This scope demonstrates SIMPEC's capability to safely self perform complex mechanical installation and fabrication works on major infrastructure projects, supporting the successful delivery of critical tunnel ventilationsystem, support for system commissioning, defect rectification and project hand over.

‍

This contract was established due to SIMPEC’s unwavering focus on ensuring our customer needs are met and our teams work safely each and every day.

Key Facts

One of Australia's largest transport infrastructureprojects, creating Sydney's third road harbour crossing and improvingconnectivity between the Warringah Freeway, North Sydney and WestConnex.

‍

Back to Projects