Wagerup BESS GIS Building Project

client
SEPD
location
Wagerup, WA
print pdfcareers

Project Overview

date completed
February 2025

Wagerup Power Station is a 2x 196MW dual natural gas and distillate fuelled power station co-located at Alcoa’s Wagerup refinery in south-west Western Australia. Located about 130 km south of Perth. The Wagerup BESS Project is located within the boundary of the power station. The project was the design and construct the 330kV Gas Insulated Sub Building used to house the 16 containers of inverters and 128 containers of batteries for the project.

Client Overview

SEPD Australia, is the local operation of SEPD Co. Ltd. As the leading industrial giant with A-grade Engineering Certification in both design and consultation, SEPD has established a strong presence in shaping the power industry worldwide. With its full capabilities in design, consultation and EPC project delivery internationally, SEPD is able to provide the most competitive services for the power transmission, distribution and renewable energy market.

Scope of Work

SIMPEC were chosen by SEPD for supply and installation of the GIS Building for the Wagerup BESS.

The principal components for the GIS Building include:

  • Detailed civil works
  • Concrete Foundations – piles, ground slab, suspended concrete slab
  • Supply and installation of structural steelwork
  • Supply installation of purlins/girts, handrail, grid mesh
  • Supply and installation of insulation, sheeting, and other building finishing works
  • Supply/installation and fit out of internal walls/doors for control room
  • Installation and load testing of overhead crane
  • Supply and installation of electrical works including lighting, power, fire system, PA, communications etc
  • Supply installation of cable, ladder and conduit
  • Construction Verification and Commissioning

This contract was established due to SIMPEC’s unwavering focus on ensuring our customer needs are met and our teams work safely each and every day.

Key Facts

Key metrics for the project include:

  • 550m3 of concrete
  • 100t of steelwork
  • 5,000m of cable